TDITD
Top 20
Give us the ML pronto.The original pit design in the DFS was based on the results of the drilling available up to 2020.
The 2022 and this year's drilling is being carried out to determine the real pit design.
If you look at page 4 of the quarterly report, one could say that 500 Mt could well be a pretty conservative guesstimation.
Have also a look at he DFS and the original boundaries of the pit.
I think it is better to wait for the official announcement to avoid big mistakes.
Cost.....
Think about CXO selling 1.4% Li2O DSO for ~US$950/T lately and you will need a calculator with lots of zeros, or an abacus he size of a Woolies carpark.
Think more along Nuts US$10
And don't forget the fukkin tin!
That BFS is going to be insane !!
A little sugar on top with an increase on what is already the biggest resource.
Poor tin keeps on being forgotten, artisanal tin will be great for local jobs, smelting onsite too. Nice little side earner along with...
DSO, and I know it's not allowed but that's in with Felix's apology he can give us a 12month reprisal on DSO from date of our 1st delivery for being so slow and dim-witted in the way his country has (not)dealt with the crime around us.
The alternative is 3 quarters of $ left, an we keep waiting.
I know which one I prefer.