Is there a possibility the Americans are dealing for that section that has been cut out? Seems a bit weird timing they show up and this chunk is removed.yes AVZ has the entire area of 13359 which includes all of Roche Dure and Carrier
Is there a possibility the Americans are dealing for that section that has been cut out? Seems a bit weird timing they show up and this chunk is removed.yes AVZ has the entire area of 13359 which includes all of Roche Dure and Carrier
13698 is only for the "tailings" (des Rejets) sitting on top of Dathcom's 13359 - or at least my understanding of it.
"Permis d'Exploitation des Rejects" as I understand it means rights to the tailings. Rejets here is the word for, well the rejected matierial after extracting, in this can tin, from the ore.
It's like Permit to exploit the rejected ore.
Yanks can have it for a pretty sum.Is there a possibility the Americans are dealing for that section that has been cut out? Seems a bit weird timing they show up and this chunk is removed.
Yes I Can’t believe the degrading comments being made on this thread surely you guys should have more respect for female’sSee you later folks, too much non-AVZ bullshit and misogyny for my liking. Thanks for the insights and info.
I'm not sure why so many people like this?The northern part of Carriere was never AVZ's .....they probably had verbal confirmation, but nothing legal binding...IMO.
But stil... the southern part of Carriere plus Roche alone will probably be an 800 mt deposit....still the biggest deposit in the world.
View attachment 16572
That's my take on it too, but I guess under the circumstances through which we've all suffered, it's understandable to think something more sinister is in play.I'm not sure why so many people like this?
Seems dead wrong to me, no offence but CDL was always contained within tenement 13359 until the mining licence decree announcement which stated that:
An area which was excluded under the Ministerial Decree to award the Mining Licence, will be renewed under a 5-year Exploration Licence to Dathcom, with discussions regarding the terms of the ongoing joint venture under discussion with the DRC Government.
It was only around this time that the shape and size of the tenement area was altered and shortly afterwards we went into suspension due to:
The voluntary suspension is requested in connection with the finalisation and release of an announcement in relation to its mining and exploration rights for the Manono Lithium and Tin Project.
Suggesting the above is possibly an issue and also suggesting imo that the southern part of the tenement currently listed as exploration would change to exploitation and the northern area would be filled in as an exploration tenement with a new number.
I thought this was just the common logic that was going around and near everybody's assumption?
I’m in from Melbourne. I run events for a crust. Happy to call in some favours. Do some damage. Keep me in the loop.I'm thinking of something truly epic..
something decedant as all fuck..
celebratory... triumphant... noble... but then suddenly.... DEBAUCHERY CITY!!!
[Let's take this to an off topic thread if we want to continue a melbourne gathering and celebration... but hey , lets wait until we cross that finish line]
The post in question stated that :That's my take on it too, but I guess under the circumstances through which we've all suffered, it's understandable to think something more sinister is in play.
As long as you don’t bully us ok….Yes I Can’t believe the degrading comments being made on this thread surely you guys should have more respect for female’s
Yes that post is totally off the plot ; it seems that some have only just started to crack onto the Cami site, seeing that the northern section is blank and basically saying it wasn't part of 13359 which is bullshit; CAMi site which uses trimble of all things, always had that area registered within 13359, it's been in that area since initial acquisition, AVZ have carried out initial sample / chip works in that area, it's not like they wondered of course by 5-10km. Anyone on the management team will tell you the same, tenement right cert has all the co coordinates of each of those corners on it.I'm not sure why so many people like this?
Seems dead wrong to me, no offence but CDL was always contained within tenement 13359 until the mining licence decree announcement which stated that:
An area which was excluded under the Ministerial Decree to award the Mining Licence, will be renewed under a 5-year Exploration Licence to Dathcom, with discussions regarding the terms of the ongoing joint venture under discussion with the DRC Government.
It was only around this time that the shape and size of the tenement area was altered and shortly afterwards we went into suspension due to:
The voluntary suspension is requested in connection with the finalisation and release of an announcement in relation to its mining and exploration rights for the Manono Lithium and Tin Project.
Suggesting the above is possibly an issue and also suggesting imo that the southern part of the tenement currently listed as exploration would change to exploitation and the northern area would be filled in as an exploration tenement with a new number.
I thought this was just the common logic that was going around and near everybody's assumption?
I've only just got my head around the size of the chunk of 13359 that has been carved out by CAMI and supposedly now to be renewed under a 5 year exploration licence to DathcomI'm not sure why so many people like this?
Seems dead wrong to me, no offence but CDL was always contained within tenement 13359 until the mining licence decree announcement which stated that:
An area which was excluded under the Ministerial Decree to award the Mining Licence, will be renewed under a 5-year Exploration Licence to Dathcom, with discussions regarding the terms of the ongoing joint venture under discussion with the DRC Government.
It was only around this time that the shape and size of the tenement area was altered and shortly afterwards we went into suspension due to:
The voluntary suspension is requested in connection with the finalisation and release of an announcement in relation to its mining and exploration rights for the Manono Lithium and Tin Project.
Suggesting the above is possibly an issue and also suggesting imo that the southern part of the tenement currently listed as exploration would change to exploitation and the northern area would be filled in as an exploration tenement with a new number.
I thought this was just the common logic that was going around and near everybody's assumption?
I'm sure she's not Linda....As long as you don’t bully us ok….
GLTAH![]()
I don't think Linda knows who Linda isI'm sure she's not Linda....
Yes. Presumably the ramifications of this are that we'll now need to prove up a whole new seperate tenement instead of continuing to drill and adding to the measured/indicated resources.I've only just got my head around the size of the chunk of 13359 that has been carved out by CAMI and supposedly now to be renewed under a 5 year exploration licence to Dathcom
It's looks to me to be about 25% of the original 13359 tenement
The CAMI carve out definitely includes the northern extension of CDL
Assuming that interpretation is correct I too would have expected the southern part of 13359 to change to "exploitation" and the northern section to be re-designated "exploration" and updated on the Cadastre Portal
So is Nige fighting to get the whole of 13359 designated "exploitation" now instead of a carve out?
Or is he thrashing out the terms of the future JV on the carved out "exploration" area to get some certainty on the balance of the 13359 tenement before coming out of suspension?
She just wants a hat I’m sure of itI don't think Linda knows who Linda is![]()
Degrading ? What on earth who was doing that ?Yes I Can’t believe the degrading comments being made on this thread surely you guys should have more respect for female’s