One step further in terms of the detailed plan:
View attachment 92728
"The district administrative council's proposed plan was made available for review until 3 November. The opportunity to submit comments has now expired.
Here you can see the documents that were included in the review:
..."
Syfte och uppdrag Detaljplanens syfte är att möjliggöra gruvverksamhet vid grafitfyndigheten Nunasvaara i Vittangi, Kiruna kommun.
www.lansstyrelsen.se
And here is the proposed plan:
pdf
____
Next:
"Audit opinion no. 2 and processing
The evaluation of the comments received during the review is not yet complete, and the proposed plan will be revised if necessary.
The audit report will be sent to those who submitted comments that have not yet been addressed."
Thanks
@cosors
I attach an ENG language translation of the detailed proposed plan and a copy of
@Gvan 's posted on the other forum which noone else seemed to pick up on over there:
Gvan's post from 3/11/2025
Talga may be able to proceed with constructing the mine site infrastructure without needing to obtain individual building permits:
From the plan proposal:
"Buildings and Development
The entire planning area will acquire a new character. The detailed plan regulates exemptions from the requirement for building permits, which means that it will be possible to develop the area with the buildings needed for the operation.
The proposed regulations through plan provisions ensure that the main establishment of new buildings takes place in the central parts of the planning area. It is not possible to cover the entire area with buildings or an open-pit mine. The western and southern outer areas are surrounded by nature, with the possibility for individual buildings of more limited scope. The regulations create a buffer zone with a high degree of preserved vegetation, which reduces visual impact.
Through regulations on maximum heights for upcoming buildings and storage areas, as well as design provisions regarding facades and roofs, the impact on the landscape is minimized"
This follows what the Planning and Building Act allows:
"
Exemptions under a detailed plan or area regulations
Section 7
To the extent that the municipality has determined, under Chapter 4, Sections 15 or 42, that an exemption from the requirement for a building permit applies, a building permit is not required, despite Section 2, to:
1. Within an area covered by a detailed plan, carry out a measure in the manner and during the time the municipality has specified in the plan; or
2. Within an area covered by area regulations, in the manner the municipality has specified in the area regulations:
a) undertake a measure concerning an accessory building,
b) carry out a small extension,
c) make an extension to or other modification of an industrial building, or
d) undertake a measure concerning a simple holiday home, allotment cabin, or another similar building.
Within a cohesive built-up area, carrying out a measure referred to in paragraph 2 a or b requires the consent of affected neighbors for the action to proceed without a building permit, if such consent is needed given the extent of the buildings in the area. The first and second paragraphs do not apply if a building permit review is necessary to safeguard the interests of neighbors or the general public."
I also mention this because NIMBYs, having completed the review period for the draft plan from CAB, are now wetting themselves about it on social media."